Our unit is on the bottom of the building, floors 1 and 2. Looking at the back, our garage is on the left. There is another unit above us, it starts on the third floor, you have to walk up two flights of steps just to get to your living room.
So today we were able to visit our new home and do a walk-through inspection of the framing, electrical, plumbing and window installation with the builder.
The front
Our lot is #89, this is our living room window and our front-door. The ground was very muddy because of all the melting snow.
So much progress in such a short time, it was very exciting
The back
In order to go inside the construction zone we were required to wear hardhats. Josie kept reaching up and touching them so finally I let her put mine on.
Mindy is looking stylish in hers.
It was an interesting experience to be able to see where all of the outlets, plugs and other receptacles will be. Also to know which walls are load bearing and which ones have pipes running through them.
They will begin hanging drywall this week and should be all finished by the end of next month or the first week of April. We'll get to do another walk-through right before closing.
Here are some pictures of what it looks like now.
The living room
Looking out the window
The kitchen (Builder on the left, inspecter on the right)
The stairs
Master bedroom
We have a box window that can be a seat.
From inside the closet, where there is also another window
Looking at the door towards the hallway and stairs
Josie's room